Chaveirim Hooks Up Power To Inspection Department

The Inspection Department – one of the many facilities in the Downtown area which lost power in Sandy, got power back today – thanks to Lakewood Chaveirim.

With no time frame goven for power to be restored to the Township Department, Chaveirim members used the large OEM Light Tower gererator to fed electric to the main electric panel. The Inspection Department is now back up and running.

As for the rest of the businesses on Clifton Avenue still without power, a Township official tells TLS there was more serious issue found with underground wires, and at this point there is no estimated time for restoration.

This content, and any other content on TLS, may not be republished or reproduced without prior permission from TLS. Copying or reproducing our content is both against the law and against Halacha. To inquire about using our content, including videos or photos, email us at [email protected].

Stay up to date with our news alerts by following us on Twitter, Instagram and Facebook.

**Click here to join over 20,000 receiving our Whatsapp Status updates!**

**Click here to join the official TLS WhatsApp Community!**

Got a news tip? Email us at [email protected], Text 415-857-2667, or WhatsApp 609-661-8668.

20 COMMENTS

  1. Simple, because there were many other downed lines that could have been the cause. Now that those are corrected you move to less obvious more ominous causes.

  2. I dont mean to sound bitter but are these certified electricians? hooking up generators to a main panel is a serious task and can result in injury or death if done incorrectly

  3. why was chaveirim busy hooking up the twp inspection office b4 local home’s & business who cares if their closed 4 a few more days is this were our fundraised money is going????

  4. TO:
    Anonymous says:
    November 7, 2012 at 10:57 pm

    Chaveirim volunteers do not get paid!

    What does “fundraised money” have to do with anything ??

    Do you think that (your) measely donation should tie a volunteer to be restricted in how he wants to spend his time?????

  5. wow , so our donations are measely ? does that mean you dont approcoate them or want them ant more ? we can give our measely donations to lcsw or hatzhola

  6. Just an FYI they had nothing to do with this a licensed electrician with the help of 2 good Samaritans did the work only after 8 days of no heat and power they are still without heat as well…. While township did not even care to check on them or try to resolve the problem with a generator.

  7. Your dibatiobs to pay fir some supplies does not mean that each volynteer becomes your slave for 24 hours a day . If thet want to takee out 15 minutes of their time to help hundreds of people and schools and shuls that could not submit permits for renovations or continue building Then they can di so without your permission

  8. #4
    PLEASE READ THIS LINE AGAIN
    Chaveirim members used the large OEM Light Tower generator to fed electric to the main electric pane, not Chaveirims generator.
    Chaveirim has numerous licensed and bonded electricians on their staff.

Comments are closed.